BobbyBruce
Sun Jan 03, 2010, 12:24 PM
Hi All,
I managed to put everything together on New Years Eve (which wasn't a good option as we had other things planned for the evening) :oops:.
I started building the stand late November as I was expecting the new 4x2x2 early December (finally arrived December 27th and I had to go to the transport depot).
Finished off the plumbing and connections as far as possible on the 30th and with the assistance of wonderful daughter moved everything to final position on 31st.
The following pics were taken during the construction of the stand.
I managed to put everything together on New Years Eve (which wasn't a good option as we had other things planned for the evening) :oops:.
I started building the stand late November as I was expecting the new 4x2x2 early December (finally arrived December 27th and I had to go to the transport depot).
Finished off the plumbing and connections as far as possible on the 30th and with the assistance of wonderful daughter moved everything to final position on 31st.
The following pics were taken during the construction of the stand.